Site Observation Report #3

Project Name:  Emory Johns Creek Hospital:  6300 Building - Suite 145

Project Address:  6300 Hospital Parkway, Johns Creek, GA 30097

Date of Observation:  Monday, 27 July 2015

Weather:  Mostly Sunny, 78°F

Time:  9:00 am

Attendees:  Cary Bond - Cork Howard Construction Company

                       Efrain Guizar - Cork Howard Construction Company

                       Erik Frandsen - Frandsen Architects, PC

                       Brittany Cencula - Frandsen Architects, PC

 

Work In Progress

- Construction of the interior partition metal stud framing system.

- Installing electrical system

- Installing above slab plumbing system

 

General Notes

- one side gypsum board has been installed on metal stud framing.

- copper water piping installed.

- building materials being stored in future reception/waiting area.

- HEPA filter used to keep negative pressure inside the construction area.

- Negative pressure alarm next to construction entry indicating negative pressure.

 

Previous Work

- filling in plumbing trenches with concrete.

 

Site Pictures