Site Observation Report #5

 

Project Name:  Emory Johns Creek Hospital:  Registration / Pre-Admissions Testing / Chapel

Project Address:  6300 Hospital Parkway, Johns Creek, GA 30097

Date of Observation:  Tuesday, 10 May 2016

Weather:  Partly Cloudy, 80°F

Time:  1:15 pm

 

Attendees:

Kevin Pittman, Cork-Howard Construction Co.

Erik Frandsen, Frandsen Architects, PC

Brittany Cencula, Frandsen Architects, PC

 

Work In Progress

- Continuing the removal of existing construction noted to be demolished.

 

General Notes

- Half of the existing aluminum framing system has been relocated to the exterior wall. 

- Most of the existing roof membrane & sloped lightweight concrete has been removed.

- A plastic barrier has been constructed in the exterior masonry openings to prevent any rain from penetrating into the space. 

- The existing cast stone sills below the existing aluminum framing have been preserved for use at the exterior wall.

 